Roof Notes Industrial roof with heavy equipment and penetrations
Dubai free zone
Warehouse roof — AC bases and penetration leaks in Dubai
A roof where the field was fine but the leaks were all around AC bases, pipes and penetrations.
The problem
Recurring leaks were tracking back to rooftop equipment, AC supports and pipe penetrations, not the open roof field.
Why this roof fails in the UAE
Details move and crack first. AC bases, parapets, pipes and drains take the most thermal and mechanical stress, so they fail long before the main roof field does.
The route we would specify
- Map every penetration, AC base, parapet and drain before pricing.
- Reinforce and treat each detail with the correct silicone detail logic.
- Tie the details into a continuous GE Enduris silicone field membrane.
- Re-check water paths so the roof drains cleanly after the work.
Price logic
Detail-heavy roofs are priced after inspection because AC bases, parapets and drains change the scope. Suitable large roofs start from AED 90/m2.