🇺🇸 UAE Founding Pilot Launch 2026

Limited Luxury Villas Selected • Pilot Pricing • Eligibility Required

UAE Silicone Roof Pilot Program 2026

Now selecting a limited number of Dubai villas for our 2026 Founding Pilot Installation.

Applications reviewed within 24 hours. Selected projects only.

About the Program

What Is the Pilot Program?

The UAE Silicone Roof Pilot Program represents a structured regional introduction of an American-engineered silicone roof protection system specifically formulated for UAE climate conditions.

This is not an experimental program or test project. It's a carefully planned launch that allows us to demonstrate the system's performance in real-world conditions while providing early participants with exclusive pilot pricing and priority scheduling.

Every installation follows our documented quality control process, ensuring consistent results and providing you with complete peace of mind. Our team follows a documented process for every project.

American-Engineered System

Silicone formulation developed for extreme heat and UV conditions

Documented QC Package

Photo documentation, coverage tracking, thickness control

Proven Performance

15+ year expected service life

Target Properties

Who Should Apply?

Our pilot program is designed for property owners who need reliable roof protection.

Luxury Villas

High-value residential properties requiring discreet, premium roof protection solutions.

Flat Concrete Roofs

Properties with flat or low-slope concrete roof structures ideal for silicone application.

Recurrent Leaks

Properties experiencing ongoing leak issues despite previous repairs or coatings.

Extreme Heat Exposure

Buildings in areas with maximum sun exposure seeking improved thermal performance.

Program Benefits

What Pilot Participants Receive

Exclusive benefits available only to pilot program participants.

Pilot Pricing

Exclusive pilot-phase pricing not available to the general public.

Installation Documentation

Complete records of surface preparation, application, and completion.

System QC Verification

Documented QC package (photos, coverage tracking, thickness control)

Scheduling Priority

Choose your preferred installation date from available pilot slots.

Requirements

Eligibility Criteria

Properties must meet the following criteria for pilot program acceptance.

Roof Condition

Roof substrate must be in structurally sound condition. Significant damage may require repairs prior to silicone application.

Access

Property must allow safe equipment access for surface preparation and application. Elevated or complex roofs may require additional assessment.

Timeline

Property owner must be available to coordinate installation within the 2026 pilot program schedule.

Deposit Readiness

Pilot acceptance requires deposit confirmation to secure your scheduled installation slot.

Apply Now

Apply for 2026 Pilot Installation

All project inquiries are handled through our pilot application process.

Thank you. Our team reviews pilot applications within 24 hours. Qualified projects will receive a scheduled callback.